For R&A projects that include the renovation of several existing courtrooms and perhaps several new courtrooms, the most effective solutions may be
Posts by Topic:
- Courthouse Planning (198)
- Telework (82)
- Open Office Design (71)
- School Security (49)
- Courtroom Design (34)
- Courthouse Security (30)
- Hybrid Office (27)
- Workplace Security (23)
- Workspace Strategy (17)
- Courthouse Technology (16)
- Return to Work (15)
- Space Utilization (13)
- Office Manners (10)
- Police Station Design (8)
- Flexible Workspace (7)
- Mobile Workforce Solutions (7)
- Remote IT Support (6)
- Space Reduction and Utilization (6)
- Space Transition (5)
- Change Management (2)
- Space planning (2)
- Integrated Building Design (1)
- Space Programming (1)
Blog
Posts by Topic
Two types of reports are integral in monitoring the space reduction progress of a space reduction program. The first is at the department or division
Trial courtrooms that accommodate criminal proceedings require five points of access to achieve a secure separation of participants: one each for the
Our previous posts about space reduction discussed all the steps necessary to establish a space baseline. Once you’ve identified your reduction
In two past blogs, we addressed modeling space, costs, and return on investment at the project and national or regional levels. This blog will
